In early March we returned to the site to etch a selection of the designs and texts produced during the initial workshops into the surface of the paving slabs. With the first tenants due to move into their new homes we felt under considerable time pressure, which was unfortunately not alleviated by poor weather, with rain and biting wind almost every day , making our working conditions very difficult and slowing down all stages of the etching process.
Wednesday 8 April 2009